How long does it take to build a website? A step-by-step look
Real timelines for a landing page, a business website and a CMS website, and the one thing that speeds up or slows down every project.
"When can it go live?" is usually the second question I get, right after the price. Here are realistic timelines, and what happens at each step so you know what to expect.
Typical timelines
Type | Usual time |
|---|---|
Landing page | 2-3 days |
Business website (5-6 pages) | 5-7 days |
Full CMS website (8 pages, admin panel) | 7-10 days |
These are working days from when we start, and they depend on how quickly feedback and approvals come in. After our first call you get a clear timeline for your project. If your deadline does not fit, I will tell you straight away.
The steps, one by one
1. First call
We talk through your goals, your customers, the pages you need and your budget. You get a clear plan and a quote. Work starts once you are happy with it.
2. Design
I design the pages in Figma first, so you can see exactly how the site will look before any code is written. Changes at this stage are quick and cheap.
3. Build
Once you approve the design, I build the site: responsive layouts, animations, forms and the admin panel if your package has one. You get regular updates and a preview link you can click through.
4. Review
You check everything on your own phone and laptop and send your changes. Each package includes a set number of revision rounds.
5. Launch
I test on real devices, connect your domain, set up the SEO basics and take the site live. Then I hand it over so you can run it.
What slows projects down
In my experience it is almost never the coding. It is usually one of these:
Content arriving late: text, photos and logos.
Slow feedback: a design waiting days for approval.
Scope growing midway: new pages or features added during the build.
How to get your site live faster
Prepare your text and photos before we start.
Pick one person on your side to give feedback.
Reply to previews within a day.
Save extra ideas for a second phase after launch.
Have a launch date in mind? Send me the date and what you need, and I will tell you honestly whether it is possible.
Frequently asked questions
- How long does a business website take?
- A business website of 5-6 pages usually takes 5-7 working days from when work starts. A landing page takes 2-3 days and a full CMS website 7-10 days.
- What slows a website project down the most?
- Mostly late content, slow feedback on previews, and new pages or features added midway. It is rarely the coding.
- Can my website go live faster?
- Yes. Have your text and photos ready, pick one person to give feedback, reply to previews within a day, and keep extra ideas for a second phase after launch.
- Do I see the design before it is built?
- Yes. The pages are designed first, and you approve the design before any code is written, when changes are quick and cheap.